Featured Project
Wembley Stadium
Client:
PC Harrington
The Project: 90,000m3 of concrete and 23,000 tonnes of steel was used in the construction of the new stadium. The roof alone weigh's almost 7,000 tonnes. At peak construction there was 1,500 people working on site. The new roof is over 11 acres. Four acres are moveable. 4,000 separate piles form the foundations of the new stadium. The deepest of these, at 35 meters, is as deep as the Twin Towers were tall.
What we did: Approx 450 as built drawings, we put together the site instructions with the original RC detail drawings to create that as built drawings to meet the safety requirements to assist the stadium to get it's structural licence.